GE Pittsfield Remediation Project Series
(190 Projects)
MT has served as the preferred prime contractor on a series of
remediation and reconstruction efforts for the GE Pittsfield Complex in
Pittsfield, MA. The extensive and complicated cleanup issues have
created the longest standing regulatory and community debate within
Massachusetts to date.
All projects in the GE series have primarily been located
within or adjacent to the Housatonic River, and have involved multiple
sheeting installations and the design of complex earth support systems.
Many projects included dredging PCB contaminated soil and water using
MT-owned long reach excavators and cranes located on shore. The key
projects within this series include:
- Housatonic River Upper Half Mile Project and Building 68 Sediment Excavation;
- F.T. Rose NPL Superfund Site;
- PCB-Contaminated Residential Properties;
- TSCA Landfill Construction & Operation Project;
- Allendale School PCB Removal & Site Remediation;
- Deming Street Riverbank Excavation & Reconstruction;
- GE 20s Complex Demolition & Site Remediation;
- GE Building 100 Decontamination & Renovations;
- GE Building 59 Demolition and Renovations;
- GE Building 41 Decontamination & Demolition;
- Building 12Y Decontamination O&M;
- GE Building 31 Stacks & Tank Farm Demolition;
- East Street Water Treatment Facility.
The Army Corps has provided Construction Oversight on the majority of
projects that MT has completed on the Housatonic River. Site activities
have included: cofferdam construction, dredging, sheeting installation,
bank sediment excavation and off-site disposal, dewatering, water
treatment, bank stabilization, erosion control measures, water
diversion, outfall & swale installations, and site restoration.
"Maxymillian
has consistently maintained the highest quality on all projects,
completing the work in a productive, timely, and safe manner. They
exhibit superior construction management skills and employ top quality
supervisors and engineers." -Mr. Grant Bowman, Mgr. Environmental
Engineering, GE
back to Experience
|
|
Extensive sheeting and excavation work using MT
owned and operated equipment.
Project Highlights
- Extensive
US Army Corps, EPA, MADEP, Executive Office of Environmental Affairs
(EOEA), Housatonic River Initiative (HRI) oversight on all Housatonic
River project work
- Superfund Site Remediation at F.T. Rose NPL Site
- Extensive fast-tracked soil, water, and wetlands remediation
- Exemplary Health and Safety records for entire series
- High level of interaction with local Community and Public Interest Groups
|
|